From requirements to an operating facility.

Flexnode coordinates the disciplines that bring an NX project together, from site and power through engineering, factory production, installation and commissioning.

6–8 months

The timeline depends on project scope, site readiness and agreed milestones.

Factory and site. Built in parallel.

A repeatable building system allows factory-built subassemblies and site preparation to advance on coordinated tracks. They come together for installation, integration and commissioning.

01 · Factory02 · Site Design release Fabrication Transport Site planning Site preparation Utilities Gate · site ready 03 · Together Install Integrate Commission Handover
01 · Factory
Design release
Fabrication
Transport
02 · Site
Site planning
Site preparation
Utilities
Gate · site ready
Install
Integrate
Commission
Handover

Illustrative workflow. Stages, durations and gates are set for each project, and either track can govern the schedule.

When the workstreams meet.

Factory production and site work are coordinated around the milestones needed for installation, integration and commissioning. The specific requirements and sequence depend on the project.

Site + approvals

Site preparation, access and the approvals needed for the relevant work.

Equipment + installation

Fabrication, delivery, site readiness and the installation sequence.

Power + integration

Utility milestones, electrical connections and the requirements for testing and commissioning.

Customer + handover

Project-specific compute inputs, commissioning participation and operating responsibilities.

The timing and responsible parties are defined for each project.

Explore how we evaluate sites →

The NX is only part of the facility.

An AI data center needs more than the IT building. Flexnode coordinates the power, cooling and supporting infrastructure around the NX, aligning equipment selection, procurement and site installation with the project's compute requirements and delivery plan.

Flexnode coordinates Design Engineering Permits + audit Manufacturing Transport Assembly Licensed trades Requirements Operating facility Upgrades + repeatability

Flexnode coordinates

  1. Requirements
  2. Design
  3. Engineering
  4. Permits + audit
  5. Manufacturing
  6. Transport
  7. Assembly
  8. Licensed trades
  9. Operating facility

Upgrades + repeatability →

Specialist partners deliver these scopes. Permits, licensed trades and supply are confirmed for each project.

The most successful infrastructure projects in history have been delivered through collaboration by the industry's best.

Flexnode coordinates an open source ecosystem of aligned partners and vendors around each project. Equipment manufacturers and specialist partners are selected for the project's requirements and matched to the NX system's defined interfaces. Open describes the supply side: any qualified manufacturer or partner whose equipment meets those interfaces can be considered.

A flexible supply ecosystem

We work across equipment manufacturers and specialist partners, selecting solutions around the project's requirements and the NX system's defined interfaces.

Procurement aligned with delivery

Equipment specifications, lead times and procurement decisions are coordinated with engineering, factory production and site work.

Gray space, configured alongside the NX

Electrical, cooling and support infrastructure is planned and installed as part of the wider facility, with its connections to the IT module coordinated for the project.

Equipment, suppliers and responsibilities vary by project. Some equipment is supplied or installed by specialist partners.

Built for the next team.

A facility may change hands several times over its life, including between operations teams. Flexnode facilities share defined interfaces, so someone who knows one can recognize the systems at another. Documentation, training, project-specific testing and commissioning establish the building's record. An organized service and maintenance history extends it, so each new team can see where the building has been and understand where it can go.

Start with what you have.

You may have a compute requirement, a site and power position, or a development mandate. Flexnode helps identify the remaining requirements and a path forward.

I need capacity

Share your compute and timing requirements.

I have a site

Share the location and available power information.

I have a project or partnership

Discuss the scope and next steps.

Discuss your project

Delivery questions.

What does the 6–8 month delivery target cover?

The target applies to the agreed scope of each project. Its start and finish milestones and site-readiness assumptions are set out in the delivery plan.

How does parallel delivery work?

Factory production and site work are coordinated to advance alongside one another where the project allows, before installation and commissioning.

Who operates the facility after handover?

Operating, maintenance and support responsibilities are defined for each project.