Delivery / How we build
Flexnode coordinates the disciplines that bring an NX project together, from site and power through engineering, factory production, installation and commissioning.
6–8 months
Targeted delivery
The timeline depends on project scope, site readiness and agreed milestones.
Rapid deployment
A repeatable building system allows factory-built subassemblies and site preparation to advance on coordinated tracks. They come together for installation, integration and commissioning.
Factory production and site work are coordinated around the milestones needed for installation, integration and commissioning. The specific requirements and sequence depend on the project.
Site preparation, access and the approvals needed for the relevant work.
Fabrication, delivery, site readiness and the installation sequence.
Utility milestones, electrical connections and the requirements for testing and commissioning.
Project-specific compute inputs, commissioning participation and operating responsibilities.
The timing and responsible parties are defined for each project.
Explore how we evaluate sites →Full-stack coordination
An AI data center needs more than the IT building. Flexnode coordinates the power, cooling and supporting infrastructure around the NX, aligning equipment selection, procurement and site installation with the project's compute requirements and delivery plan.
Flexnode coordinates an open source ecosystem of aligned partners and vendors around each project. Equipment manufacturers and specialist partners are selected for the project's requirements and matched to the NX system's defined interfaces. Open describes the supply side: any qualified manufacturer or partner whose equipment meets those interfaces can be considered.
We work across equipment manufacturers and specialist partners, selecting solutions around the project's requirements and the NX system's defined interfaces.
Equipment specifications, lead times and procurement decisions are coordinated with engineering, factory production and site work.
Electrical, cooling and support infrastructure is planned and installed as part of the wider facility, with its connections to the IT module coordinated for the project.
Equipment, suppliers and responsibilities vary by project. Some equipment is supplied or installed by specialist partners.
Continuity
A facility may change hands several times over its life, including between operations teams. Flexnode facilities share defined interfaces, so someone who knows one can recognize the systems at another. Documentation, training, project-specific testing and commissioning establish the building's record. An organized service and maintenance history extends it, so each new team can see where the building has been and understand where it can go.
Where you start
You may have a compute requirement, a site and power position, or a development mandate. Flexnode helps identify the remaining requirements and a path forward.
Share your compute and timing requirements.
Share the location and available power information.
Discuss the scope and next steps.