Flexnode evaluates sites and power positions for AI infrastructure, whether you have a property or need help identifying a location.
Site screening
Five screening factors guide each review. They are weighed together for each project and do not form a scoring formula.
Pathways
01
Undeveloped land with a power position or a path to one. Review starts with power, access and local conditions.
02
A property with existing service or underused space. Review checks available capacity, layout and site constraints.
03
Former industrial, storage or mining sites. Existing infrastructure may shorten the path, subject to review.
Power, connectivity, demand, development readiness and community fit are reviewed together. Self-storage, mining and other existing sites can qualify when power and site conditions support an NX deployment.
An address, a parcel, a utility conversation or a power position is enough to begin a first review.